我公司承建的湖北省武汉市千子山循环经济产业园生活垃圾焚烧发电项目烟气净化工程于2022年12月09日通过72+24小时试运行。 The FGC project undertaken by HXET for waste-to-energy plant in Qianzishan circular economy industrial park, Wuhan Hubei, passed 72+24 hours of trial operation on December 9, 2022.
该项目建设总处理规模为1500t/d,建设2x750t/d的生活垃圾焚烧炉和1x35MW的凝汽式汽轮机+1x40MW的发电机组及其配套设施。烟气处理采用“SNCR(非我司合同范围内)+半干法(Ca(OH)2)+干法(碳酸氢钠)+活性炭喷射+袋式除尘器+低温SCR+催化剂(三菱重工)”的烟气净化工艺,为我司设备供货工程。 The treatment capacity of the plant is 1500 t/d. A set of 2x750 t/d waste incinerator, 1x35 MW condensing steam turbine, 1x40 MW generator, and supporting facilities will be constructed. The FGC adopts the process of "SNCR (not within the scope of contractor) + semi-dry with Ca(OH)2 + dry method with sodium bicarbonate + activated carbon injection + bag filter + low-temperature SCR + catalyst from Mitsubishi Heavy Industries". It is an equipment supply project of Huaxing.
华星东方在湖北省的业绩涵盖包括:武汉新沟、武汉千子山、石首、当阳、利川、十堰、随州、黄冈罗田、咸宁、荆州公安、荆州监利、孝感、黄冈红安、荆州洪湖、仙桃、荆门沙洋等多个项目。 The achievements of HXET in Hubei Province include Wuhan Xingou, Wuhan Qianzishan, Shishou, Dangyang, Lichuan, Shiyan, Suizhou, Huanggang Luotian, Xianning, Jingzhou Public Security, Jingzhou Jianli, Xiaogan, Huanggang Hong'an, Jingzhou Honghu, Xiantao, Jingmen Shayang, etc.