The FGC System for the MSW incineration power generation plant in Zhaoxian, Shijiazhuang, Hebei, undertaken by HEPT, has officially commenced construction
2026.07.29
The FGC System for the MSW incineration power generation plant in Zhaoxian, Shijiazhuang, Hebei, undertaken by HEPT, has officially commenced construction since 1st. Jun 2026.
This project involves the construction of a new No.3 incineration line, equipped with one 750 t/d mechanical grate incinerator, a waste heat boiler and supporting FGC system. Among them, the SNCR denitrification system within the FGC process, together with the supporting ammonia unloading & storage system and ammonia/desalinated water conveying system, shall be undertaken by HEPT under an EPC general contracting model.
HEPT’s track record in Hebei Province covers numerous projects including Baoding Phase I & Phase II, Hengshui, Anping (Hengshui), Dingzhou, Cangzhou Phase I, Shijiazhuang, Shijiazhuang Xianengxin, Xingtang (Shijiazhuang), Zhaoxian (Shijiazhuang), Caofeidian (Tangshan), Luanzhou (Tangshan), Fengrun (Tangshan), Jiecheng (Tangshan), Qian’an (Tangshan), Weichang (Chengde), Shunping (Baoding), Tangshan Phase I & Phase II, Northern Zhangjiakou (Chengde), Gu’an (Langfang), Xianghe (Langfang), Sanhe (Langfang), Shahe (Xingtai), Weixian (Xingtai), Julu (Xingtai), Weixian (Handan) and other projects.