Home
About us
Company Introduction
Honor
Corporate culture
News & Events
Corporate News
Corporate business
Ultra clean emission
Desulphurisation (acid removal) operations
Denitrification business
Remove dust
Fly ash conveying
Fly ash stabilization
Engineering performance
Ultra clean emission
Desulfurization (deacidification)
Denitration
Remove dust
Fly ash conveying
Fly ash stabilization
Contact us
Contact Us
Join Us
National regulations
National regulations
LAN:
EN
CN
EN
National service hotline
400-117-5858
LAN:
EN
CN
EN
Focus on atmospheric control and enjoy free breathing
Focus on atmospheric governance and enjoy free breathing
Corporate News
Location:
Home
>
News & Events
华星东方 开工大吉
2022.02.08
金牛辞岁寒风尽,玉虎迎春福气来。
正月初八,我们开工了!
Prev:华星东方承建的浙江省金华市第二生活垃圾焚烧发电项目烟气净化工程通过72+24小时试运行
Next:华星东方给您拜年了!
Back
2026.04.23
喜报ㅣ江苏华星东方再获“北极星杯”2025垃圾焚烧发电行业评选活动“配套服务匠心企业”奖项
2025年9月,江苏华星东方受邀参与“北极星杯”2025年度垃圾焚烧发电行业评选盛典。此次评选历时逾月,历经紧张投票、专家评审及评选委员会综合考量,我司最终在众多入围企业中崭露头角。自2020年度(首届)垃圾焚烧发电行业评选活动获奖以来,江苏华星东方已连续六届荣膺“配套服务匠心企业”殊荣!
2026.04.17
HEPT Achieves Remarkable Success in exporting core equipment business, which demonstrates China's environmental protection strength.
HEPT Achieves Remarkable Success in exporting core equipment business, which demonstrates China's environmental protection strength.
2026.04.14
The FGC System for Wengyuan Household WtE Plant in Shaoguan, Canton, undertaken by HEPT Successfully Passes 72+24 Hour Trial Operation
The FGC System for Wengyuan Household WtE Plant in Shaoguan, Canton, undertaken by HEPT, has successfully passed the 72+24 hour trial operation since 15th. April, 2025.
2026.04.13
HEPT's FGC System for Binyang WtE Plant in Nanning, Successfully Passes 72+24 Hour Trial Operation
HEPT's FGC System for Binyang WtE Plant in Nanning, has successfully passed 72+24 hour trial operation since 13th. March 2026.
2026.03.31
Construction Commences on Waste Incineration Project of Zhuozi MSW Incineration Power Generation Plant in Ulanqab, Inner Mongolia, Undertaken by HEPT
The Small-scale Grate and FGC system of Zhuozi MSW Incineration Power Generation Plant in Ulanqab, Inner Mongolia, undertaken by HEPT, has commenced construction since June 28th., 2024. This project represents not only another masterpiece of HEPT's dedicated cultivation in the environmental protection sector but also a significant breakthrough in small-scale was
About us
Company Introduction
Honor
Corporate culture
News & Events
Corporate News
Corporate business
Ultra clean emission
Desulphurisation (acid removal) operations
Denitrification business
Remove dust
Fly ash conveying
Fly ash stabilization
Engineering performance
Ultra clean emission
Desulfurization (deacidification)
Denitration
Remove dust
Fly ash conveying
Fly ash stabilization
Contact us
Contact Us
Join Us
National regulations
National regulations
National service hotline
400-117-5858
FollowYouTube
Follow Tiktok
Legal Notices
Site Map
Website statistics
Copyright © 2021 Jiangsu Huaxing East Environmental Protection Technology Co., Ltd.All Rights Reserved. 备案号:
苏ICP备16018214号