EN
华星东方承建的浙江省金华市第二生活垃圾焚烧发电项目烟气净化工程通过72+24小时试运行
2022.02.25

我公司承建的浙江省金华市第二生活垃圾焚烧发电项目烟气净化工程于2021年10月1日通过72+24小时试运行。


The flue gas cleaning (FGC) project undertaken by Huaxing East for the 2nd waste incineration power plant in Jinhua, Zhejiang passed the 72 + 24 hour trial operation on October 1, 2021.




该项目总处理规模为3000吨/日,其中一期处理规模为2250吨/日,采用三套750吨/日的焚烧线,二期再增加一套750吨/ 日的焚烧线;配置2×35MW汽轮机发电机组。烟气处理采用SNCR+浓缩液回喷系统+旋转喷雾半干法+干法(NaHCO3干粉)+ 活性炭吸附+布袋除尘器工艺,为我司EP工程。


The capacity of the plant is 3000 tons / day (t/d), of which the capacity of phase I is 2250 t/d. Three sets of 750 t/d incineration lines are adopted. The other 750 t/d incineration line is added in phase II, applying 2 × 35 MW steam turbine. The FGC applies SNCR+Concentrated liquid recirculating spray system+rotary spray semi-dry (SDA) + dry process (NaHCO3 solid lime powder) + activated carbon adsorption + bag filter process. It's an EP project of Huaxing East.




华星东方在浙江省的业绩涵盖包括:慈溪、鄞州、兰溪、上虞、青田、德清、丽水、奉化、建德、金华、平阳、海盐、嘉兴、爱拓、海宁、永嘉等多个项目。


Huaxing East's achievements in ZheJiang Province include: Cixi、Yinzhuo、Lanxi、Shangyu、Qingtian、Deqing、Lishui、Fenghua、Jiande、Jinhua、Pingyang、Haiyan、Jiaxing、Aituo、Haining、Yongjia