我公司承建的浙江省嘉兴市嘉源康恒生活垃圾焚烧发电项目烟气净化工程于2023年01月11日通过72+24小时试运行。 The FGC project contracted by Huaxing for Jiayuan SUS waste-to-energy in Jiaxing, Zhejiang passed 72+24 hours trial operation on January 11, 2023.
该项目建设三台机械炉排炉和两台汽轮发电机组。烟气处理采用“SNCR(氨水)(非本次合同范围内)+ 半干反应塔+ 干法(Ca(OH)2)+ 活性炭喷射 + 袋式除尘器 +蒸汽-烟气再加热器(SGH)(非本次合同范围内)+SCR(氨水)(非本次合同范围内)+湿法(NaOH)(为我司设备供货)+ 烟气-烟气换热器(GGH)(非本次合同范围内)”的烟气净化工艺,为我司EPC工程。 The plant will construct 3 mechanical grate furnaces and 2 steam turbine generators. The FGC adopts the process of "SNCR with ammonia (not contractor scope) + semi dry reaction tower + dry Ca(OH)2 + activated carbon injection + bag filter + SGH (not contractor scope) + SCR with ammonia (not contractor scope) + wet NaOH supplied for Huaxing equipment + GGH (not contractor scope)". It's an EPC project of Huaxing.
华星东方在浙江省的业绩涵盖包括:洞桥、慈溪一期、二期、三期、鄞州、兰溪、上虞、青田、德清、丽水、奉化、建德、金华、平阳、海盐、嘉兴、海宁、永嘉、吉安、龙游、温岭、台州等多个项目。 The achievements of Huaxing in Zhejiang province include Dongqiao, Cixi phase I, II, and III, Yinzhou, Lanxi, Shangyu, Qingtian, Deqing, Lishui, Fenghua, Jiande, Jinhua, Pingyang, Haiyan, Jiaxing, Haining, Yongjia, Ji'an, Longyou, Wenling, Taizhou, etc.