HEPT breaks ground on Phase II FGCS for Wuzhong WtE plant in Ningxia Hui Autonomous Region
2026.02.28
HEPT has broken ground on Phase II FGCS for Wuzhong WtE plant in Ningxia Hui Autonomous Region since 15th. Aug 2025.
This Phase II expansion system features a designed MSW treatment capacity of 500 TPD, configured with one 500t/d incineration line and one 10MW extraction-condensing steam turbine generator unit. The FGCS employs a multi-stage process comprising SNCR, semi-dry scrubbing (rotary atomizer spray dryer), dry scrubbing (hydrated lime injection), activated carbon injection, baghouse filtration and fly ash conveying, storage & stabilization. This system is executed by HEPT on an EPC (Engineering, Procurement, and Construction) basis.
HEPT's project portfolio in the Ningxia Hui Autonomous Region includes Wuzhong,Yinchuan and various other projects.