EN
The first phase of the flue gas cleaning project focused on the comprehensive utilization and disposal project of general solid waste resources in Longyou County, Quzhou City, Zhejiang Province, undertaken by Huaxing East Co., has started the construction process
2023.10.31
The flue gas cleaning project of the second phase of Zhangqiu household waste incineration power generation project in Jinan city, Shandong province, which was constructed by our company, passed the 72+24 hours trial operation on August 28th, 2023.
The total design scale of the project is to process 1,800 tons of domestic waste per day, and is equipped with 2×900t/d mechanical grate incinerator + 1×45MW medium-temperature sub-high-pressure condensing steam turbine generator set. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotary spray reaction tower absorber) + dry method (injection of calcium hydroxide) + activated carbon injection + BHF+ fly ash transportation and storage", which is our EPC project.
The achievements of Huaxing East Co. in Shandong include: Weifang Phase I, Phase II, Weifang Zhucheng, Weifang Gaomi, Weifang Changle, Yantai Muping, Tai'an, Zichuan, Zibo Lintong Phase I, Phase II, zibo Yiyuan, Linyi Phase II, Linyi Lanshan, Linyi Yishui Phase I, Phase II, Qingdao xiaoyuxi, Qingdao Huangdao, Qingdao Laixi, Dezhou, Dezhou lingcheng, Dezhou Linyi, Weihai Wendeng, Yantai Longkou, jinan Shanghe, Jinan Zhangqiu Phase II, Jinan Taian, Jinan Laiwu, Jining Yanzhou, Jining Yutai, Zaozhuang, Yantai Laizhou, Heze Dingtao, and many other projects.

Click or scan below for more information!
Follow us!