EN
The FGC project undertaken by Huaxing for Suixi Biomass Power Plant in Huaibei, Anhui passed the commissioning acceptance
2022.10.25

The flue gas cleaning (FGC) project undertaken by Huaxing East for Suixi Biomass Power Plant in Huaibei, Anhui passed the commissioning acceptance on August 17, 2022.

The plant constructed a 1×130 t/h circulating fluidized bed (CFB) boiler with high-temperature and ultra-high pressure biomass, equipped with 1×30 MW extraction condensing steam turbine generator. The FGC adopted the process of "in-furnace calcium injection + flue gas denitration (not the scope of Huaxing) + cyclone ash pre-remover + lime injection and dry desulfurization tower + bag filter including desulfurization agent storage and conveying system, process water system, etc.". It is an EPC project of Huaxing.

The references of Huaxing in Anhui Province include Huaibei, Wuhu, Tianchang, Lujiang Phase II, Woyang, Hexian, Xiaoxian, Wuwei, Huoqiu, Jinzhai, Hanshan, Tushan Thermal Power, Mengcheng, etc.

For more information, please click or scan below!

Follow us!