The flue gas cleaning (FGC) project undertaken by Huaxing East for Xiangshui, Yancheng biomass power plant passed the 72 + 24 hours trial operation on June 25, 2021.
该项目新建1×130t/h高温超高压生物质循环流化床锅炉,配1×30MW发电机组。烟气处理采用旋风除尘+喷射干法脱硫+布袋式除尘工艺(包含脱硫剂存储及输送系统、工艺水系统等),为我司EPC工程。
The plant built 1×130 t/h high temperature & ultra-high pressure biomass circulating fluidized bed boiler, and equipped 1×30 MW generator set. The FGC adopted cyclone dust removal + dry injection desulfurization + bag filter including reagent storage and conveying system, process water system, etc. The FGC is an EPC project of Huaxing.
目前华星东方在江苏省的业绩涵盖包括:锡东二期、无锡益多、淮安、盐城大丰、连云港、宜兴热电、泰兴、盱眙、宿迁、常州金坛、徐州、张家港等多个项目。
The reference projects of Huaxing in Jiangsu include East Wuxi phase II, Yiduo Wuxi, Huai'an, Dafeng Yancheng, Lianyungang, Yixing thermoelectricity, Taixing, Xuyi, Suqian, Jintan Changzhou, Xuzhou, Zhangjiagang, etc.