我公司承建的安徽省合肥庐江二期生活垃圾焚烧发电项目烟气净化工程于2021年11月1日通过72+24小时试运行。
The flue gas cleaning (FGC) project constructed by Huaxing East for Lujiang, Hefei waste Incineration power plant (Phase II ) in Anhui province passed 72+24 hours trial operation on November 1, 2021.
该项目建设1×500t/d+1×9MW纯凝式汽轮发电机组。烟气处理采用SNCR+旋转喷雾半干法+干粉喷射+活性炭喷射+袋式除尘器+GGH+SGH+SCR(三菱重工)工艺,为我司EP工程。
The plant has 1×500 t/d boiler and 1×9 MW pure condensing turbine. The FGC adopts SNCR + rotary spray semi-dry method + dry powder spraying + activated carbon spraying + bag house filter + GGH + SGH + SCR of MHI process. The FGC is an EP project of Huaxing East.
华星东方在安徽省的业绩涵盖包括:淮北、芜湖、天长、庐江、涡阳、和县、萧县生物质、无为、霍邱、金寨、含山、涂山热电、蒙城等多个项目。
Huaxing East's achievements in Ahui Province include: Huaibei、Wuhu、Tianchang、Lujiang、Guoyang、Hexian、Xiaoxian、Wuwei、Huoqiu、Jinzhai、Hanshan、Tushan、Mengcheng etc.